PORT BRACKEN, Oregon — The port has closed a 600-foot section of its north seawall path after wet leaves, seaweed and light litter remained suspended above the walkway during two mornings of low fog. The commercial dock and public boat ramp remain open, and pedestrians are being directed through the fish-market parking lot.

The closure begins at the ice house and ends beside the harbor maintenance shed. It follows a Monday cleanup in which two employees found debris held at heights ranging from several inches to about five feet. A paper cup, six alder leaves and a strand of rockweed stayed in place after the wind dropped and did not fall when the railing beneath them was shaken.

Maintenance worker Silas Mott said the material occupied a narrow band of fog moving inland from the water. Items outside the band fell normally. Inside it, small objects could be pushed aside with a grabber but stopped again when released, as though resting against surfaces workers could neither see nor feel with a bare hand.

The first band dissolved shortly after 9 a.m., dropping the debris at once across the path. Port staff swept the walkway, checked the railing for fishing line and reopened it before lunch. Tuesday's fog formed farther east and held a fresh line of leaves over the center of the path, prompting the longer closure.

No one has reported being held or injured. A cyclist entering before the second barricade was placed passed through the fog without resistance, though a loose receipt lifted from his basket and remained behind at shoulder height. Staff returned it when the air cleared. The rider used the parking-lot detour on his return trip.

Fog droplets can make spider silk and fine plant fibers difficult to see, said Rena Sol, a coastal meteorologist who visited the harbor. Temperature layers may also carry paper and leaves in weak rising air. Sol said those effects usually move with air currents or visible filaments, while several of the port's objects stayed fixed as smoke from a test wand passed around them.

Employees checked lamp posts, the railing and adjacent pilings with oblique lights and found no netting, adhesive spray or electrical line across the path. A portable fan displaced the fog but not the debris. When the fan was turned off, mist closed around the same pieces without changing their positions.

The detour adds about four minutes for residents walking between the bus stop and the cannery shops. Fish-market manager Nella Voss has allowed pedestrians through a marked loading lane between deliveries. The port also moved two benches so people waiting for the bus do not gather beside forklift traffic.

Port manager Mina Kell said staff will keep the path closed during dense morning fog and reopen it after a physical sweep. She declined requests to leave objects in place for photographs, saying the route is a working walkway and the port cannot certify that an apparently empty section of air is clear. Collected material is being held only long enough to document the cleanup.

By noon Tuesday, the harbor was clear and every suspended item had fallen except a brown alder leaf near the ice house. It remained upright about three feet above the concrete in full sunlight. Mott placed a shallow tray beneath it and waited rather than touch it again. At 2:17 p.m., the leaf dropped flat into the tray. The concrete below was wet from the morning fog except for a dry leaf-shaped patch directly under where it had hung.

■